Skip to content
MATBAUConsulting
Pricing

Clear prices. Services adapted to your project.

See the price types and what drives them. The final price is always confirmed by us in writing before any payment.

Fixed price

Apartment technical inspection

Price on request

VAT: [TO BE COMPLETED] · Across Europe

  • + Condition of visible finishes: walls, floors, windows and doors
  • + Signs of moisture, condensation and mould in accessible areas
  • + Accessible electrical, plumbing and heating installations — visual and basic functional check
  • – Destructive testing or laboratory tests
Fixed price

House technical inspection

Price on request

VAT: [TO BE COMPLETED] · Across Europe

  • + Everything in the apartment inspection, adapted to the size
  • + Building envelope and facades, from accessible areas
  • + Roof and attic, where access is safe
  • – Invasive investigations
Per visit

Construction site monitoring

Price on request

VAT: [TO BE COMPLETED] · Across Europe

  • + Site visit at agreed stages
  • + Observations on visible quality and conformity
  • + Photo notes
  • – Statutory site supervisor role, unless contracted separately
From

Focused technical consultation

Price on request

VAT: [TO BE COMPLETED] · Across Europe

  • + Initial discussion and review of information received
  • + On-site visit if needed
  • + Technical opinion within our professional scope
  • – Design work
Custom quote

Site supervision

Request a quote

VAT: [TO BE COMPLETED] · Across Europe

  • + Checking compliance with permit and design
  • + Attending key inspection stages
  • + Reviewing quality documents
  • – Design
Custom quote

Technical execution manager

Request a quote

VAT: [TO BE COMPLETED] · Across Europe

  • + Monitoring execution quality for the contractor
  • + Quality documentation
  • + Attending key inspection stages
  • – Site supervision for the same project
From

Project coordination & management

Price on request

VAT: [TO BE COMPLETED] · Across Europe

  • + Schedule and milestones
  • + Stakeholder coordination
  • + Periodic progress reports
  • – Licensed design
Custom quote

Technical building audit

Request a quote

VAT: [TO BE COMPLETED] · Across Europe

  • + Individually defined scope
  • + Inspection of agreed areas
  • + Review of existing documentation
  • – Statutory expert report, unless contracted through a certified expert
Pricing logic

How is the fee built up?

Specialist time+Preparation+Site visit+Equipment+Travel+Analysis & report+Operating costs+Risk allowance+Margin+Applicable VAT

This is the logic we use to build a quote, not a published breakdown of internal costs.

Non-binding estimator

Estimate your service

Every factor below affects the price. The estimate is not a contractual offer.

Result

Estimate available after we review your request

The estimate is not a contractual offer.

Optional extras

What’s included / not included

ServiceIncludedNot included
Apartment technical inspectionWritten report with observations and photos · Prioritised findings · Recommended next stepsDestructive testing or laboratory tests · Certified structural expert report · Spaces inaccessible on the day
House technical inspectionWritten report with photos · Findings by priority level · Recommendations and suggested further investigationsInvasive investigations · Foundation checks requiring excavation · Certifications or permits
Construction site monitoringVisit note after each trip · Updated issue logStatutory site supervisor role, unless contracted separately · Carrying out or repairing works
Focused technical consultationTechnical note or memo with recommendationsDesign work · Certified expert report · Laboratory testing
Site supervisionRole-specific documents as required by local lawDesign · Carrying out works
Technical execution managerRole-specific documentsSite supervision for the same project
Project coordination & managementProject plan · Periodic reportsLicensed design · Carrying out works
Technical building auditAudit report with priorities and recommendationsStatutory expert report, unless contracted through a certified expert

Example situations

Illustrative scenarios, without prices — to show how the quote changes.

Illustrative · 01

Two-room apartment

Below the reference floor area, full access. The quote usually follows the fixed rate, with no adjustments.

Illustrative · 02

House above the area threshold

Several levels and an attic. The visit takes longer, and the quote includes a floor-area adjustment.

Illustrative · 03

Construction site, several visits

We agree the key stages. The quote is built on the number of visits and trips.

Pricing questions

Get a written quote